Historical Installed Capacity
In 2025, Taipower system’s total installed capacity was 59,842MW, in which thermal power accounted for 58.7% and renewable energy, 37.0%.
In 2025, Taipower system’s total installed capacity was 59,842MW, in which thermal power accounted for 58.7% and renewable energy, 37.0%.