Your browser can not be support! You can still read webpage correctly without script. / Main Projects / Distribution Feeder Automation Project
| ::: |

裝飾性圖片Distribution Feeder Automation Project

Introduction
To cope with the national economic prosperity and the industrial promotion, and to increase the people’s living standard, Taipower is taking its full effort to enhance the network infrastructure to provide more reliable and higher quality of electricity. In fact, distribution system is the most downstream level of the electric power system, and is directly related to the customer’s electricity consumption.  However, due to its wide spread in area and easily affected by nature phenomena such as weather, electric network fault is unavoidable. When a fault occurs, it is our aim to locate and isolate the fault in the shortest possible time, such that power could be restored quickly.
 
Due to the fast growing economy that causes the highly concentrated population in the metropolitan area, traffic jams occur very often.  Whenever outages occur, it is almost impossible to reach the fault location quickly to carry out emergency repair.  The duration of power outage would be extended and induces many complaints from the customers. Therefore, to reduce the outage time and the affected area are the focus of improvement on our distribution power system.
 
 
System Objectives

1. To reduce outage duration and affected area and increase reliability of power supply.

2. To computerize the supervisory control of distribution system and establish comprehensive information for operation.

3. To promote the technical level of distribution system operation and enhance customer-end service.
 
 

Implementation Schedule (Taipei West Branch part only)
Implementation Schedule

Year

2006

2007

2008

2009

Implementation Scope(number of automated feeders)

110 finished

(8 in the mountain area)

33 Finished

+81

+77