Statistics
Substation holding Extra High Voltage transformer Substation :1 Primary transtormer Substation and Secondary transformer substations on the power plaut:3 Secondary transformer substations :7 Pecondary transformer substations:2
Main transformer and Distribution feeders Total of main transformers (including temporary transformer):29 Distribution feeders: 135
Utilization ratio The installed capacity: 802.5MVA The peak load reached: 487.5 MVA The utilization ratio: 60.8%
Others There are 16 transformer substations,33 main transformers provided by customers. The peak load of contract:128.1MW |